A rough guide
As a rough guide, an average bedroom with walls, ceiling and woodwork usually takes one to two days. A hallway, stairs and landing takes longer because of the height, the spindles and all the doors. A whole house is usually a week or more. We give you a firm time on the quote.
Day one is mostly prep
Furniture moved and sheeted, holes and cracks filled, sanded and dusted, woodwork keyed, and any bare plaster or stains primed. It does not look like much is happening, but this is what makes the finish last.
Then the colour
Ceiling first, then walls, then woodwork, usually two coats on each. Drying time between coats is the thing nobody can rush.
What slows a job down
New plaster that needs a mist coat, dark colours going light, wallpaper that needs stripping, damp patches, and lots of fiddly woodwork.
Living in the house while we work
Most people stay at home while we decorate. Surfaces are protected while we work, and we do a full tidy at the end of the works.